EPOXY FLOORINGOrleans

Epoxy Flooring in Orleans

Prepared, coated and cured, one layer at a time.

Garage, basement and commercial epoxy floors, plus polished concrete, for Orleans and across Ottawa.

COAT 01Positioning

Preparation decides the result.

Grinding, moisture checks and crack repair happen before any resin is mixed. A floor that fails usually failed at this stage, not at the topcoat.

The room decides the coat system.

A garage that sees road salt, a basement with a floor drain and a service bay with trolley traffic do not want the same build up. The system follows the use, the slab and the season.

The cure decides the handover.

Cure is part of the work. We tell you when the floor can take foot traffic, when furniture goes back and when a vehicle can park, based on the product and the conditions on site.

COAT 03The slab comes first

The slab comes first

Concrete is not a stable, sealed surface. It is porous, it moves, and it holds moisture. A coating bonds to what it is applied over, so the slab has to be sound, clean and open before the first coat goes down.

Preparation starts with diamond grinding. Grinding removes cure compounds, old sealers, paint, adhesive and the weak top layer of the slab, and it opens the surface so the primer can key into it. Acid etching is not a substitute: it leaves salts behind and does not profile the surface evenly.

Moisture comes next. A slab on grade in Ottawa can hold moisture from below, from a missing or failed vapour barrier, or from a downspout that empties beside the foundation. We test for it and read the result before choosing a system. Where moisture is high, the answer is a moisture tolerant primer or a different build up, not a thicker topcoat.

Cracks and joints are opened, cleaned and filled with an epoxy mortar before coating. A moving joint needs a flexible filler, not a rigid patch that will crack again. Edges, aprons and thresholds get attention because that is where a coating lifts first.

None of this shows in the finished floor. It decides whether the finished floor stays put.

COAT 04Our process

Four steps, in order

The full process
  1. 01

    Consultation and site visit

    We look at the slab, the room and how it is used, and talk through the realistic options.

  2. 02

    Slab assessment and scope

    Moisture, cracks, joints and existing coatings are recorded, and the scope is written down.

  3. 03

    Preparation and coating

    Grinding, repairs, primer, body coat and the topcoat, in that order, with cure between coats.

  4. 04

    Cure and handover

    The floor cures, then we walk it with you and set out care and traffic timing.

COAT 05Ottawa seasons

Salt, slush and a cold slab

Ottawa floors live through salt, slush, sand and freeze-thaw. A garage slab takes road salt in on the wheels and holds it against the surface. That is why a garage system is specified with salt and hot tyres in mind, and why the edges and the apron get the same attention as the middle of the floor.

Temperature matters as much as the product. Coatings need a slab and an air temperature inside the range the product allows, and they need it to hold there through the cure. In a heated interior, work can run through the winter. In an unheated garage, the slab usually waits for warmer months, because a cold slab slows the reaction and can trap moisture at the worst moment.

Basements have the opposite problem. They are cool and often damp, so moisture testing comes before anything else. Where a basement is finished, the coating has to suit the room above it: a floor drain, a low ceiling and limited ventilation all change how the work is planned.

Body coat with flake, cured and topcoated

COAT 07Questions

Before the first visit

Short answers to the questions that come up most often. The full list is on the FAQ page.

All questions
How long does an epoxy floor take to cure?

It depends on the product and the conditions. Foot traffic, furniture and vehicle traffic all come at different points, and we confirm the timing for your floor at handover rather than quoting a number in advance.

Can you coat a garage floor in winter?

A heated interior can be worked in through the winter. An unheated garage usually has to wait for warmer months, because the slab and air temperature have to stay inside the range the coating needs through the cure.

Do you test for moisture before coating?

Yes. Moisture is checked before a system is chosen, especially in basements and in garages on a slab on grade. Where readings are high, the answer is a moisture tolerant primer or a different build up.

What is the difference between epoxy and polyaspartic?

Epoxy builds the body of the floor and bonds to the prepared slab. A polyaspartic topcoat is often used over it where a faster return to service or better colour stability in sunlight matters.

Can you coat over an existing epoxy floor?

Sometimes. It depends on how well the existing coating is bonded, what it is and how worn it is. Where the bond is failing, the old floor is removed and the slab is prepared again.

How much does an epoxy floor cost?

It depends on the project: the size, the condition of the slab, the repairs needed and the system chosen. We set out the scope before any work starts so the cost follows the work.

Do you grind or acid etch the concrete?

We grind. Diamond grinding removes old coatings and the weak top layer, opens the surface for the primer and keeps the profile even. Acid etching leaves salts behind and does not profile consistently.

How soon can I park on the floor?

It depends on the product and the conditions on site. We give you the foot traffic, furniture and vehicle timings for your floor at handover, along with care notes for the first weeks.

COAT 08Start a project

Request a consultation

Tell us about the room, the slab and the timing. We reply by email, usually with a few questions about moisture, access and how the floor will be used.

Prefer email? info@epoxyflooringorleans.com

Your details are used to reply to this request. See the privacy policy.